Abstract

A double line of precast concrete, three-sided, arch culvert-bridge units that were used to enclose Brush Creek between two Kansas City, Missouri, suburbs is described. Two principal streets intersected on top of the structure. The contractor was allowed only 14 days to complete construction of the structure and reopen the intersection. The Brush Creek Improvements project in Prairie Village, Kansas, required 100 pieces of double-cell CON/SPAN precast culvert units with 6.10 m (20 ft) of span and 2.13 m (7 ft) of rise and 78 pieces of precast concrete footings. The design also featured an S-curve alignment.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.