Abstract

Floor grouting in soft rock roadway is one of the effective ways in floor heave control, and this method is being promoted quietly and quickly, but the applying effect is far from satisfied, the reasons are that: the depth of floor grouting is not enough and the influence of water hiding in floor hasnt been attached great importance. This paper analyzed the characteristics of floor broken rock zone in soft rock roadway and pointed out the importance of floor grouting in soft rock roadway, then proposed a practical method of floor grouting. The analysis conclusions show that: the depth of floor broken rock zone that can reach more than 4m is much greater than that of roof broken rock zone due to the double influences of surrounding rock stress and water; the important role of floor grouting in soft rock roadway is draining off free water from broken rock zone in order to strengthen roadway floor; floor grouting includes three important steps: plugging water channels, pumping out free water and grouting in deep holes. The article has revealed common blind spots of floor grouting methods existing, the method this article has noted can solve floor heave of soft rock roadway well, and it has very good application prospects. Key words: soft rock roadway, floor grouting, broken rock zone, free water in floor

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.