Abstract

Equipment Handling Process or Equipment handling is very important because all equipment must be handled properly. so that it can reach its destination safely and also to maintain the condition and quality of the equipment being handled. The method used in this research to analyze the calculation using load and unloading data. Purpose of this study was to determine the ideal value in the buoyancy after and before load process at the time of loading and unloading material at Port. The result analysis based on hydrostatic reviews and ship stability in terms of ship buoyancy capatibilty is stated to be suitable and stable according to IMO standards. Value of the ability of the barge to accept the load when the laden condition is fully loaded is +-6000 tons, thus to achieve a full load condition with a total load. 6000 tons) of 1.035 meters (still meets the minimum standard of 0.2 meters).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call