Abstract

ABSTRACT: To quantify the effectiveness of best management practice (BMP) implementation on runoff, sediment, and nutrient yields from a watershed, the Nomini Creek watershed and water quality monitoring project was initiated in 1985, in Westmoreland County, Virginia. The changes in nonpoint source (NPS) loadings resulting from BMPs were evaluated by comparing selected parameters from data series obtained before, during, and after periods of BMP implementation. The results indicated that the watershed‐averaged curve number, sediment, and nutrient (N and P) concentrations were reduced by approximately 5, 20, and 40 percent, respectively, due to BMP implementation. The nutrient yield model developed by Frere et al. (1980) was applied to the water quality parameters from 175 storms, but it failed to adequately describe the observed phenomena. Seasonal changes in nutrient availability factors were not consistent with field conditions, nor were they significantly different in the pm‐ and post‐BMP periods. An extended period of monitoring, with intensive BMP implementation over a larger portion of the watershed, is required to identify BMP effectiveness.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call