Abstract
<p style='text-indent:20px;'>In today's competitive world, scheduling problems are one of the most important and vital issues. In this study, a bi-objective unrelated parallel machine scheduling problem with worker allocation, sequence dependent setup times, precedence constraints, and machine eligibility is presented. The objective functions are to minimize the costs of tardiness and hiring workers. In order to formulate the proposed problem, a mixed-integer quadratic programming model is presented. A strategy called repair is also proposed to implement the precedence constraints. Because the problem is NP-hard, two metaheuristic algorithms, a multi-objective tabu search (MOTS) and a multi-objective simulated annealing (MOSA), are presented to tackle the problem. Furthermore, a hybrid metaheuristic algorithm is also developed. Finally, computational experiments are carried out to evaluate different test problems, and analysis of variance is done to compare the performance of the proposed algorithms. The results show that MOTS is doing better in terms of objective values and mean ideal distance (MID) metric, while the proposed hybrid algorithm outperforms in most cases, considering other employed comparison metrics.</p>
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.