Abstract

Building information modeling (BIM) has recently gained popularity in the architecture, engineering, and construction industry. Specifically, BIM has been applied in facilities management (FM). However, FM-integrated BIM and MM-integrated BIM are likely to fail when BIM-FM models are not effectively updated or maintained. Thus, it is critical to focus on the management of BIM-FM models during the operation stage of buildings. While several researchers have examined BIM applications and system developments in the context of FM, there is a dearth of research on BIM management, particularly in the operation stage of sustainable buildings. Thus, an approach for BIM-FM models management is herein proposed for building projects. A BIM-FM models management (BFMM) system for owners during the operation stage was developed to ensure effective implementation for the management of BIM-FM models. Using a building in Taiwan as a case study, this study discussed and evaluated the effectiveness of the proposed BFMM system. The results reveal that the BFMM system significantly increases the efficiency of BIM-FM model management. The results of this study can provide a useful reference for those interested in adopting BIM to manage building project facilities. This study concludes by presenting the advantages and limitations of BIM-FM models as well as suggestions for future applications.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call