Abstract

ABSTRACT Building Information Modeling (BIM) data has the advantages of high quality, operability, and parametric capabilities. In recent years, the application of BIM in construction planning for building robots has been increasing. Task planning for rebar binding is an important aspect of construction, and there is a growing trend of using robots to improve the accuracy and efficiency of binding operations. However, the complex and dynamic construction site environment poses significant challenges for task planning in rebar binding. Therefore, this paper proposes a new BIM-based task planning method for a wheeled-legged rebar binding robot, which can quickly generate an optimal task sequence. Firstly, an initial set of rebar intersection points is generated based on BIM data. Then, considering the execution dead zone of the robot and the variable workspace of the binding mechanism, the rebar intersection points set is decomposed and filtered using morphological opening operations. Finally, a constrained genetic algorithm is employed to sort the set of task points. Simulation and real-world experiments were conducted using a wheeled-legged rebar binding robot as the research subject. The results demonstrate that, compared to manual planning, the average binding efficiency is approximately 1500 points per hour, which is 1.97 times higher than manual operation. This validates the applicability and effectiveness of the proposed method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.