Abstract

Recent research reveals a surge in the number of slums in Sub-Saharan Africa with no sign of abating. Thus, the upgrading of slums to improve the living conditions of those who live in such environments is imperative. However, the performance of past slum upgrading projects has been quite contentious with many failing to meet their pre-defined objectives. This study investigates the influence of integrated BIM and M&E on the performance of slum upgrading projects in Sub-Saharan Africa. A questionnaire was used to gather data from 88 M&E and BIM experts. It emerged that on average 68.6% “Agreed and Strongly Agreed” that integrating both M&E and BIM can significantly improve the performance of slum upgrading projects compared to each when applied in isolation. Consequently, future studies should focus on developing an integrated BIM and M&E framework for monitoring slum upgrading projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.