Abstract

A new mathematical model for a flow shop scheduling problem is presented in the fuzzy environment. It proposed bi-criteria to be maximized, that is, minimal satisfaction degree with respect to the earliness of jobs and, minimal satisfaction degree of tardiness of jobs. A simulated annealing algorithm was proposed to solve this model in the fuzzy environment. This method was implemented in MATLAB 7.0 software. Key words: Simulated annealing, bi-criteria, fuzzy, earliness and tardiness penalty, flow shop scheduling.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call