Abstract
In this paper, simulated annealing (SA) algorithm is employed to solve the flowshop scheduling problem with the objective of minimising the completion time variance (CTV) of jobs. Four variants of the two-phase SA algorithm (SA-I to SA-IV) are proposed to solve flowshop scheduling problem with the objective of minimising the CTV of jobs without considering the right shifting of completion time of jobs on the last machine. The proposed SA algorithms have been tested on 90 benchmark flowshop scheduling problems. The solutions yielded by the proposed SA variants are compared with the best CTV of jobs reported in the literature, and the proposed SA-III is found to perform well in minimising the chosen performance measure (CTV) particularly in medium and large size problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Process Management and Benchmarking
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.