Abstract

Within the framework of a Coordinated Research Project on Evaluation of High Temperature Gas-Cooled Reactor Performance (CRP-5) initiated by the International Atomic Energy Agency (IAEA), the calculation of steady-state temperature distribution of the 10MW High Temperature Gas-Cooled Reactor-Test Module (HTR-10) under its initial full power experimental operation has been defined as one of the benchmark problems. This paper gives the investigation results obtained by different countries who participate in solving this benchmark problem. The validation works of the THERMIX code used by the Institute of Nuclear and New Energy Technology (INET) are also presented. For the benchmark items defined in this CRP, various calculation results correspond well with each other and basically agree the experimental results. Discrepancies existing among various code results are preliminarily attributed to different methods, models, material properties, and so on used in the computations. Temperatures calculated by THERMIX for the measuring points in the reactor internals agree well with the experimental values. The maximum fuel center temperatures calculated by the participants are much lower than the limited value of 1,230°C. According to the comparison results of code-to-code as well as code-toexperiment, THERMIX is considered to reproduce relatively satisfactory results for the CRP-5 benchmark problem.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call