Abstract

The construction of stay cable is the key technology problem in large span spatial structures. This paper carried out a study on the construction scheme of stay cables based on the practical project of Shiyan stadium roof. The loss of tensile force caused by the seven steel wring with different construction order is summarized according to the experimental construction, and the tensile force slacken analysis method was used to calculate the stress of construction. Moreover, the loss of tensile force caused by anchor and relaxation is considered too. Then, the control tensile force of construction, which is used to realize the tensile construction one time, is obtained. Results of the engineering test show that the construction process is simplified and he construction scheme is economic under the condition of allowed precision. The method can provide reference for similar projects.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call