Abstract

In order to solve the problem of tunnel diseases caused by lining cracking in mountain tunnels, this paper studies the crack repair technology of mountain tunnels. Based on this, this paper innovatively puts forward a new repair method of tunnel cracks—plate-short anchor assembly structure. Through literature investigation and theoretical derivation, the mechanical mechanism of the plate-short anchor assembly structure is analyzed, and the calculation formula of bearing capacity is proposed. The loading device for the bias pressure test of prototype components of tunnel lining is independently designed, and the destruction test is successfully carried out by simulating the stress mode of tunnel lining. By simulating the state changes of the plate-short anchor assembly structure under different cracking states, the ultimate bearing capacity under different working conditions is obtained, and the evolution process of the failure mode of the new structure is revealed.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call