Abstract

This study addresses an integrated batching and scheduling problem for a single-machine flexible machining cell in which each pallet can load multiple parts, i.e. multi-fixturing pallets, and part processing times can be changed with different processing costs, i.e. controllable processing times. The batching sub-problem is to select the set of parts to be produced in each period of a planning horizon and the resulting scheduling sub-problem is to determine the set of parts to be loaded on each multi-fixturing pallet, the part processing times and the pallet input/processing sequences for the parts selected in each period. A bi-criterion objective is considered that minimises the total tardiness and the total processing cost simultaneously. A solution approach is proposed that consists of three phases from the first to the last period: (a) generating the whole schedule over the planning horizon; (b) selecting the parts to be produced during the current period using the scheduling information; and (c) determining the final schedule for the selected parts. Simulation experiments were done on a number of test instances and the results are reported.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.