Abstract
It studies the balance problems of cycle time of a flywheel production line in this paper. Based on the working time measured using lean manufacturing (LP) methods, the bottleneck processes of production line are found by simulating with software Witness, which is improved by using production cycle balancing method. Comparing the relevant parameters before and after the production line balance,the improvement results of production line are significant and the production efficiency can be improved.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.