Abstract
Abstract A CSP-C continuous sampling plan is a new single-level continuous sampling procedure developed by Govindaraju & Kandasamy (2000) by incorporating the concept of acceptance number to the CSP-1 plan for the application of continuous production processes. In this new plan, the sampling inspection phase is characterized by a maximum allowable number of non-conforming units, c, and a constant sampling rate, f. Govindaraju & Kandasamy (2000) derived the performance measures such as average outgoing quality (AOQ), average fraction inspected (AFI) etc, of the CSP-C plan using a Markov chain model for long run production processes. Yang (1983) has observed that the AOQ and AFI, being long run average measures, are not satisfactory measures of performance for short run production processes. Hence, formulas are derived in this paper, using the renewal theory approach enabling one to compute AOQ and AFI for both long run and short run production processes. Numerical illustrations are also given. By simulatio...
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.