Abstract

For the current investigation, one has selected the Polyvinyl Chloride (PVC) industry located in the Hisar District. PVC plants are only regarded as commercially viable when all four units are in good operating condition. When all four of the system's parts are in good operating order, the system operates at its peak efficiency. When three of the four units are operational, it operates at a reduced capacity. When two or more units fail, the system is said to be in a failed condition. There are separate rates of continuous failure and repair for each of the four units. There is always one repairman available. With the aid of accurate scenarios, it is still necessary to determine how disappointment/repair rates affect the MTSF, accessibility, and server at a busy time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.