Abstract

The deployment time of a taut-wire mooring is reduced to the time any transportation/hoisting device needs to put a payload at the sea surface. This is a matter of minutes rather than hours needed for deployment of long deep-ocean moorings in the regular way. It is achieved by extending the basic function of mooring parts to temporarily form a Launcher for Oceanographic Equipment and Instruments (LOEI). Full preparation of the mooring is done onshore where the instruments are prepared and programmed, and spooled onto the top-buoy together with the line. At sea, no other gear is required than a device that is able to lift a load of, say, 2000 kg, even for long deep-ocean moorings. The compact mooring method realizes considerable budget savings through deployments from non-research vessels and airborne transportation-deployment. Limitations lay in size and weight of the oceanographic instruments. We present a test-design shaped as a barbell and loaded with 940 m line and 3 current meters. Unfurling speed was maximally 2.3 m s −1 and the descent speed amounted 1.2 m s −1 until landing on the seabed. These speeds are comparable to those acquired during a conventional free-falling mooring deployment.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.