Abstract

In this work, Artificial Intelligence (AI) based Ant Colony Optimization (ACO) algorithm is proposed for Load Frequency Control (LFC) of interconnected multi–area hydrothermal power systems. Area 1&2 are thermal power systems and area 3 is a hydro power system, all the areas are interconnected through the appropriate tie-line. Thermal and hydro power plants are applied with reheat turbine and electric governor respectively. Investigated power system initially applied with conventional Proportional-Integral (PI) controller and controller parameters are optimized by using trial and error method considering Integral Time Absolute Error (ITAE) objective function. After that, the system is equipped with Proportional – Integral – Derivative (PID) controller and controller parameters are optimized by using ACO algorithm with ITAE objective function. The superiority of the proposed algorithm has been demonstrated by comparing conventional controller. Finally, The Simulation results of multi-area power system prove the effectiveness of the proposed optimization technique in LFC scheme and show its superiority over conventional PI controller.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.