Abstract

An all-weather automated construction system has been developed to reduce the total cost of high-rise reinforced concrete building construction. It was applied for the first time ever to the construction of a 26-story reinforced concrete condominium project located in the Tokyo Metropolitan area in 1995. This system incorporates four major elements: (a) a synchronously climbing all-weather temporary roof; (b) a parallel material delivery system; (c) prefabrication and unification of construction materials; and (d) a material management system. It ensures good quality; improves working and environmental conditions; reduces the construction period, manpower, and waste; and improves overall productivity.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.