Abstract

The purpose of this paper is to introduce material management system based on daily schedule management. The backbone is a scheduling system that adopts a production planning system as well as a project scheduling system. The lowest level in the scheduling system is the daily schedule management, which is linked to material management system. The paper focuses on the material management and scheduling systems to implement a material “pull” system for reducing materials inventories on site. Benefits and challenges of material management and scheduling systems are discussed through interview with managers and engineers.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.