Abstract

This article addresses a general tri-objective non-permutation flowshop problem to minimise the makespan, the sum of flow time and maximum tardiness simultaneously. In order to enhance the applicability of the model, some practical assumptions are included. These are release dates, past sequence-dependent set-up times, a truncated generalisation of Dejong’s learning effect and predetermined machine availability constraints. First, the problem is formulated as a mixed-integer linear programming model. Second, the true Pareto front is achieved with augmented ε-constraint method for small-sized problems. Third, due to the high complexity of the model and the impractical computational times of larger instances, a heuristic algorithm based on the ε-constraint method is also proposed. Finally, the algorithms are tested to gauge their effectiveness, and the results are compared with other methods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.