Abstract

There is little known about the indirect consequences of rework in construction projects, especially the financial costs. Therefore, this paper uses examples from a case study to demonstrate the potential indirect consequences and costs that are associated with undertaking rework in building construction projects. A novel taxonomy for categorising the indirect consequences at an individual level, organisational level and project level is presented. Based on the findings from examples derived from the case study, it is suggested that the incidence of rework can have a multiplier effect of up to six times the actual (direct) cost of rectification. To reduce these costs it is concluded that design and construction organisations must improve their quality management systems by including a quality system for continuously auditing, analysing and presenting direct as well as indirect rework costs.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.