Abstract

In a competitive electricity market, generation capacities can exactly cover their full costs. However, the real market deviates from this ideal in some aspects. One is the concern of non-existent or insufficient scarcity prices. We present an iterative method in a linear optimization model to investigate the profitability of assets in the absence of scarcity prices and how the system changes when this risk is incorporated into investors’ expectations. Therefore, we use a two-step optimization of capacity planning and unit commitment. Iteratively, mark-ups at the height of uncovered costs are added to investment costs. This typically leads to a system with better investment profitability while keeping the system cost increase low. The methodology is applied to a simplified brownfield generation system, targeting CO2-free power generation within 25 years. In a model with annual foresight of actors, iterations result in a generation system with significantly lower (or even no) uncovered costs for new investments within ten or fewer iterations. Our example case with full foresight shows that early-added gas (combined cycle) and wind onshore capacities are able to recover their full costs over a lifetime, even without scarcity prices. However, the contribution margin gap remains high, especially for storage and biomass.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call