Abstract

The quality of railway track geometry is the significant parameter for track manager for planning repair works and track mainte-nance. Monitoring of the experimental sections around the portals of tunnel construction Turecky vrch carried out by DRETM is focused on long-term monitoring of track alignment design and geometry of the railway track (absolute and relative) with the standard structure of railway superstructure, slab track and transitional areas between these structures. Outputs presented in this paper follows the paper Evaluation of Track Design and Track Geometry of the Track with Unconventional Structure of Railway Superstructure (of authors J. Šestáková and M. Mečár) and presents partial results of the quality assessment of track sections after realizing six measurement cycles.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.