Abstract

The paper focuses on the problem of the effective management of materials obtained from demolition in the scope of the revalorisation of historical structures. The conditions that influence the reclamation and reuse of materials were analysed. The entirety of the discussion was based on the practical example of the revalorisation of the Outer Courtyard of Wawel Castle, for which the importance of these conditions has been determined, as well as the relationships between them.

Highlights

  • Renovation work and demolition work belong to the group of construction works that generate larger amounts of waste than in the case of erecting new structures

  • The implementation of the principles of reverse logistics within a given construction project should be preceded by an analysis of its conditions, the type and character of which is going to depend on its specifics

  • Expanding the set of basic conditions that are known from literature [8] by including additional ones will allow a comprehensive analysis of the problem in question to be performed in the scope of projects associated with the revalorisation of historical buildings

Read more

Summary

Introduction

Renovation work and demolition work belong to the group of construction works that generate larger amounts of waste than in the case of erecting new structures In such cases, appropriate waste management, which needs to be taken into account already at the planning and design stage, and needs to be implemented during the carrying out of a project, is of particular importance [1]. Financial conditions apply to the technology and organisation of work in the context of the reclamation of construction materials and their reuse through reincorporation These conditions apply to the financial costs of the performance of: construction work, the transport of materials obtained through demolition, the necessary quality analysis, as well as work that prepares an element for reincorporation or its recycling and neutralisation. Temporal conditions associated with the time needed for performing the abovementioned technological and organisational processes in the context of the reclamation of construction materials and their reincorporation, or recycling, as well as neutralisation. The values of the difference ( ri - ci )are placed on the axis of ordinates, while the values of the sum (ri+ci ) are placed along the abscissa

Basic information on the project
Structural analysis of the conditions
Analysis of the results
Conclusions