The paper deals with the assessment of the damage of a concrete dome type of structure and the method of repairment. Due to own weight of the dome, the concrete portion of the dome near bottom rim is in tension and the steel reinforcement was not sufficiently provided, causing cracks at bottom and leakage at top of dome. UPV tests, profometer tests and core drilling were carried out to observe the condition of existing dome. Testing results were used as bases for constructing repairment method, epoxy grout, epoxy mortar and the use of carbon fibre reinforced plastic (CFRP).