Abstract

• Eleven operational hydropower plants in Ethiopia were environmentally assessed using LCA. • Medium-scale hydropower plants have higher impacts than large plants, which confirm the belief that large hydropower is cleaner than smaller one. • Construction and installation phase causes significant environmental impacts. • Contribution of transportation is less than 2%. • End-of-life recycling of metal scraps effectively leads to reduced metal depletion.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call