Abstract
In today's ever increasing demand for transportation services, the national road agencies are finding themselves in mounting pressure to provide reliable road transportation system. Despite efforts to improve the programming and implementation by the central and regional road agencies, the quality of national road system is constantly decreasing. For years the government of Indonesia has relied on traditional design-bid-build approach for delivery of road and highway construction and maintenance projects. This paper reports the result of study on alternative project delivery methods for road construction in Indonesia as way to improve the quality of national road system. The study is the first step toward identifying the potential application of alternative delivery method for the national road network system. The paper also summarizes the survey results from road agencies and contractor concerning the current road project delivery system as well as attempts to assess the viability of implementing design-build and performance-based contract approach.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Proceedings of the Eastern Asia Society for Transportation Studies
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.