Abstract
Assessing and managing performance risk is important for complex product development projects. The performance risk of complex product development can be defined as the probability failing to achieve desired performance level subject to cost and time constraints. This article presents a simulation model based on the graphical evaluation and review technique (GERT) and analyzes the complex product development project using simulation data. The model computes the probability distribution of project duration and cost in a GERT network with multifeedback branches considering activities rework that is caused by probabilistic failure to meet the planned design objective. A simulation strategy is designed to assess the performance risk in both subsystems and system development. With the performance risk assessment methodology, project managers can make a better decision and then minimize the performance risk of product development project. Finally, an obstacle clearance armored vehicle development project is used to illustrate the effectiveness of the proposed model. Copyright © 2012 John Wiley & Sons, Ltd.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.