Abstract

Through analysing the assembly relation between the product parts, this paper divided the product parts into function parts and the connectors. Then the simplified assembly semantic relation graph model was established in this paper. The concept of assembly connection strength was introduced to express the complexity of assembly between the parts. Using the least assembly time as the goal to determine the optimal unit division number, the assembly unit division was accomplished based on the connection strength. Finally using the spindle box of HTC2500hs as an example to check this division method, the results show that this method has applicability and effectiveness.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.