Abstract

In the fiercely competitive shipbuilding industry, precise cost estimates must be considered as they serve as a critical input for determining market prices effectively and ensuring a small profit for the shipyard. In Western Europe, where most projects are Engineering-To-Order (ETO), cost estimations are extra challenging, due to lack of similarity between projects. On top of this, cost estimations are becoming increasingly difficult in a market confronted by mounting challenges related to safety regulations, cost-effectiveness, and the pressing need to address energy conservation and environmental protection. New technologies introduce changes in nearly all aspects of shipbuilding design and construction. This article conducts a literature review, to present the state-of-the-art methods for estimating man-hours, explicitly focusing on man-hours for shipyard production, excluding overhead costs and challenges the suitability of existing systems for ETO and especially for the changes caused to ships by the energy transition. An indication is given of the practicality of each method as outlined in the literature. A solution direction, incorporating the construction process, is proposed to improve cost estimations for ETO projects in pre-contract phase.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.