Abstract
In this paper we study the problem of scheduling a batching machine with nonidentical job sizes. The jobs arrive simultaneously and have unit processing time. The goal is to minimize the total completion times. Having shown that the problem is NP-hard, we put forward three approximation schemes with worst case ratio 4, 2, and \(\frac{3}{2}\), respectively.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.