Abstract

AbstractWe give first constant-factor approximations for various cases of the coupled-task single machine and two-machine flow shop scheduling problems with exact delays and makespan as the objective function. In particular, we design 3.5- and 3-approximation algorithms for the general cases of the single-machine and the two-machine problems, respectively. We also prove that the existence of a (2−ε)-approximation algorithm for the single-machine problem as well as the existence of a (1.5−ε)-approximation algorithm for the two-machine problem implies P=NP. The inapproximability results are valid for the cases when the operations of each job have equal processing times and for these cases the approximation ratios achieved by our algorithms are very close to best possible: we prove that the single machine problem is approximable within a factor of 2.5 and the two-machine problem is approximable within a factor of 2.KeywordsApproximation AlgorithmCompletion TimeApproximation RatioSingle MachineFeasible ScheduleThese keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call