Abstract

Approaches to develop targets for production of intense radioactive ion beams (RIBs) have been evaluated over the past five years. It is acknowledged that many desired physics objectives using RIBs can be met only by using production beams of energetic protons with currents up to 100 μA. Such beams can be made available at future spallation neutron facilities. The production targets will require active cooling to control operational temperatures due to internal heating caused by the production beam. A target concept has been selected, and calculational analyses of the target concept have been performed to guide the design of a prototype target for an in-beam test of the actual thermal behavior. For this test, a high-power test facility is needed; fortunately, the beam currents required exist at the TRIUMF accelerator facility. An experimental proposal has been approved for such a test.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call