Abstract

What liner configuration should you use for a tailings facility? Do you need a geosynthetic liner? Should you include overdrains above your liner? This paper presents an approach to answer these questions for a case study tailings facility in a semi-arid environment. The case study project includes a performance criterion that the seepage flux be limited below the impoundment. Four liner configurations were shortlisted, and the efficacy of each arrangement compared with numerical modelling. The configurations are: (1) tailings directly over a liner, (2) tailings on an overdrain system over a liner, (3) tailings on an overdrain system over a blinding layer over a liner, and (4) sealing the foundation with tailings slimes (i.e., no geosynthetic membrane). This paper also presents estimates of the longevity of an HDPE liner system, as this is vital in assessing performance over very long time periods. Seepage and consolidation modelling results indicate that overdrains do not improve the potential to meet the performance criterion and overdrains have a limited post-closure consolidation benefit. All configurations with geosynthetics indicated the liner system would function adequately during the period prior to geosynthetic membrane degradation. The slimes sealing case was shown to not provide an adequate impedance to flow.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.