Abstract

The aim of this study was to set the overall production level for each grade of coated peanut product to meet market demands with a minimum production cost. The linear programming model was applied in this study. The proposed model was used to minimize the total production cost based on the limited demand of coated peanuts. The demand values applied to the method was previously forecasted using time series method and production capacity aimed to plan the aggregate production for the next 6 month period. The results indicated that the production planning using the proposed model has resulted a better fitted pattern to the customer demands compared to that of the company policy. The production capacity of product family A, B, and C was relatively stable for the first 3 months of the planning periods, then began to fluctuate over the next 3 months. While, the production capacity of product family D and E was fluctuated over the 6-month planning periods, with the values in the range of 10,864 - 32,580 kg and 255 – 5,069 kg, respectively. The total production cost for all products was 27.06% lower than the production cost calculated using the company’s policy-based method.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call