Abstract

Doing the research of technology forecasting, numerous quantitative and qualitative methods can be employed. When utilising a quantitative method to estimate the future performance of a technology, many assumptions need to be conformed. But for an emerging technology, historical data is rare and the upper limit is usually unknown. In this paper, we try to use grey prediction model for technology forecasting and examine the performance of the model by comparing with the Gompertz model and Bass model, which are also used for upper limit unknown and few data forecasting. Three criteria, the MSE, the MAE and the MAPE, will be used for comparison. The result shows that grey predicting model performs better than the other two models for forecasting the emerging technology.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call