Abstract
This paper discusses four public agency approaches to applying alternative technical concepts (ATCs) to construction manager–general contractor (CMGC) project delivery through an analysis of case study projects. The CMGC projects included a slope stabilization project in Michigan, a bridge in Oregon, the urgent, in situ foundation stabilization of a dam in Kansas, and a commuter rail project in Utah. The study results showed that ATCs provide a valuable mechanism to identify the best qualified contractor during the CMGC selection process. ATCs also permit an owner to consider innovative design solutions to constructability problems through the contractor's early involvement. The addition of ATCs to CMGC procurements permits an owner to accrue all of the savings offered by a contractor's ATCs because the contractor's preconstruction services’ contract compensates the contractor for developing the ATCs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Transportation Research Record: Journal of the Transportation Research Board
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.