Abstract
AbstractTeams that deliver complex transportation construction projects need tools that manage risk and allow for successful delivery. Construction manager/general contractor (CM/GC) project delivery is an alternative method that furnishes public agencies with an attractive option for delivering projects in a less adversarial and more constructive manner by involving the contractor during the design phase. This paper identifies the effects of CM/GC delivery on construction process risk. Owners, contractors, and design engineers with sizable CM/GC experience on transportation-related projects were surveyed to identify differences in the perception of CM/GC processes, especially compared to design-build and design-bid-build project delivery methods. The perceived benefits and disadvantages regarding quality, schedule, cost control, and collaboration/flexibility are discussed. The benefits include strategies for robust process risk management and successful project delivery, while the disadvantages expose ba...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Construction Engineering and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.