Abstract
We present a combined electromagnetic method which consist of Audio Magnetotellurics (AMT) and Transient Electromagnetic method (TEM) to the utilize in the selecting sites for ultra high voltage power plant. The inversion profile gives the underground resistivity distribution for the power engineers to select proper ground site location. The result is satisfactory and some ground sites have been established already, indicating that electromagnetic method is suitable for selecting the ground site for ultra high voltage power plant.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have