Abstract

Reduction of the overhead lines back-flashover rate (BFR) after application of special lightning protection systems is analyzed in this paper. The following lightning protection systems are considered: line arresters, underbuilt wires, additional shield wire and guy wires. Partial or combined efficiencies of mentioned lightning protection systems are analyzed. Overhead distribution (35 kV) and transmission (110 kV and 220 kV) lines BFR are estimated through the semi-statistical calculation procedure as suggested in international technical documents. System equivalent circuits in the EMTP-ATP software are created with carefully chosen models and parameters of elements. Pursuant to the estimated results, conclusions about application possibilities of different lightning protection systems are given.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.