In this paper, three kinds of static loading test methods were introduced by referencing three offshore wind farms in China. In the first project, O-cell tests were performed on four steel pipe piles, namely, two vertical piles and two inclined piles, with diameters of 1.7 m and embedment depths from 67.24 to 69.70 m. Next, the equivalent load-settlements for top-down load and pull-out load tests at the pile heads were given by using a conversion method. Then, the conversion results were verified using different methods. Finally, the rationality of utilizing the coefficient factors of γ1 and γ2, which were 0.8 and 1.1 in the first project, were verified by studying three piles in two other offshore wind farm projects, where a top-down load test and pull-out load test were conducted on each pile. The results show that the O-cell test can successfully determine the axial compression capacity and uplift capacity by the proposed conversion method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.