Abstract

With the development of a heavy fine-RRB-layering system and dynamic adjustment, the number of large differential pressure wells increases gradually. The effect of high-pressure difference wells on water injection development is that it is difficult to separate water injection allocation, low pass rate of layers and short effective period of separate sealing, which affects the development effect of water flooding. For this reason, the research on stratified water injection technology with large pressure differences is carried out using step-by-step throttling. The throttling pressure difference borne by the water nozzle is reduced. The large throttling pressure difference produced by the water nozzle is realized. The qualified rate of the layer section is increased to improve the anti-creep performance of the expansion Packer and the sealing effect of large pressure difference injection wells and to extend the service life of the Packer. The field application results of 216 wells in the Shengli Oil Field show that the technique can effectively improve the pass rate of the layers and the sealing effect of the layers and prolong the life of the string.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call