Abstract

Post Fukushima nuclear disaster, the distributed energy resources (DERs) based integrated microgrid (IMG) is under consideration as an alternative source to strengthen the station blackout power supply in nuclear power plants. The complete IMG blackout during switching over from on-grid to islanded mode is still an outstanding issue. The biggest challenge is power restoration to loads within 3 min of time after making black-start operation of DERs. A conceptual design of programmable logic controller based smart microgrid controller is proposed in this research to meet these challenges. In addition to it, a suitable protection scheme is also suggested to avoid transitional collapse of safety power supply. The concepts of black-start and sequential load restoration process are validated by using PSCAD/EMTDC simulation platform, a widely used power system transient and switching operation analysis tool. This software allows the users to assemble the circuit graphically, run the simulation, analyze the results, and manage the data in a completely integrated graphical environment. Based on the analysis reported in this paper, it is observed that the fluctuations in voltage and frequency are high during black-start operation. Hence, power electronics based soft starter is suggested to overcome these issues.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.