Abstract
This project is a case study conducted in a manufacturing company aiming at improving its productivity using line balancing techniques. Waste reduction, especially the time waste, is an important factor to shrink the manufacturing cost. The main purpose of this project is to suggest a better line balancing approach with an aim of reducing the idle time, work station number, and manpower requirement while improving the efficiency to meet the target production in the apparel manufacturing organization. For accomplishing the purpose, different line balancing methods named Largest Candidate Rule, Kilbridge & Wester method, and Ranked Positional Weight method carried out for analyzing the line efficiency, production rate, work station number, manpower requirement, and time utilization. Finally, an efficient and balanced line were proposed with respect to the auspicious outcome of the production area. Also, by using the line balancing techniques, a new sequence of work has been developed to arrange the work elements into the workstation. Some optimum layout has been proposed that has minimized the idle time and manpower requirement.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.