Abstract

PurposeThis paper aims to apply lean manufacturing using value stream mapping (VSM) in the manufacturing organization (automotive suspension and fastening components section). To validate the VSM approach, simulation has been done.Design/methodology/approachVSM approach has been used to implement lean stages in the U-bolt section. Current state map was prepared and future state map has been implemented. Further, simulation has been done to compare current state and future state maps.FindingsIt has been found that there is 87.59% reduction in cycle time (C/T), 76.47% reduction in work-in-process (WIP) inventory, 95.41% reduction in production lead time, 66.08% increase in value added (VA) ratio, 95.78% reduction in non-value added (NVA) time, 57.14% reduction in the number of operators and 70.67% reduction in change over (C/O) time for the U-bolt section. Simulated and VSM of current and future state has observed error of 5 s.Research limitations/implicationsThis study is based on automotive manufacturing industry situated in northern part of India. The outcome of this study is applicable only to the selected product of the manufacturing company.Originality/valueThis paper deals with case study part which reflects the true picture of implementation of Lean manufacturing (LM) tools in the organization.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.