Abstract

Purpose – The purpose of this paper is to discuss the lean implementation process and its quantified benefits for the production industry with the help of value stream mapping (VSM). Both current and future state maps of the organization's shop floor scenarios are discussed using VSM techniques in order to highlight improvement areas and to bridge the gap between the existing state and the proposed state of shop floor of the selected industry.Design/methodology/approach – VSM process symbols are used to discuss lean implementation process in the production industry. The existing status of the selected manufacturing industry is prepared with the help of VSM symbols and improvement areas are identified. Some modifications in current state map are suggested and with these modifications a future state map is prepared.Findings – After comparison of the current and future state of shop floor of the selected industry it is found that reduction in lead time was 83.14 percent, reduction in processing time was 12.6...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.