Abstract

The problem of recovery from power-system failures is the problem of handling operations that make it possible to supply power from other lines in response to power-system failures or construction by switching between the opened and closed states of sectionalizing switches. Considerable research has already been conducted with regard to this issue. This paper addresses the issue of determining target systems for final recovery in cases when some sections remain subject to power failure (i.e., sound bank capacity < load capacity). For this purpose, intersection is conducted only for parameters within such power-failure sections. In such research, calculations are implemented by setting a value of 2 to the sectionalizing switches of a single parameter. In addition, when the state of a sound section changes due to mutation improvements, the method of simultaneously changing the selected points and neighboring sectionalizing switches is applied. It is clear that the proposed method, consisting of conventional GA only, is superior in terms of average fitness values.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.