Abstract

It is easy to cause Yangtze River embankment soil slip or even collapse to have a deep foundation pit construction adjacent to Yangtze River outside embankment,with lots of risk . A new combined construction technique for large caisson is presented. The construction technology, the earthwork excavation of deep high pressure jet grouting pile combined with undrained open caisson construction technology, with data monitoring for the open caisson excavation control is adopted. This study mainly summarizes the advantages of deep high pressure jet grouting pile combined with undrained caisson combined construction technology engineering application, and describes the process of the combined construction and measures of deviation correction.The new combining construction technique has made a relatively effective protection for the Yangtze River levee and its ecological environment,having great engineering application value to some similar engineering.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call